top of page
CLICK IMAGE TO ENLARGE
FOOTBRIDGE OVER THE RIVER CONGOST LINKING JOAN CAMPS STREET AND ARENYS STREET IN GRANOLLERS
DESCRIPTION: New footbridge and approaches comprising a three span 71.5 metre long Corten steel truss deck with a main span of 30 metres in Granollers (Spain).
CLIENT: Granollers City Council
DATES: 2005 - 2007
CONCEPT DESIGN: Xavier Font (MLM Consulting Engineers)
STRUCTURAL ENGINEERING: Xavier Font, Lee Bowker, Jonathan Hudson and John Hawkins (MLM Consulting Engineers)
SITE SUPERVISION: Xavier Font (Alfa Polaris)
COST: 642.700 €
PHOTOGRAPHER: Xavier Font
bottom of page