top of page
CLICK IMAGE TO ENLARGE
DECK REPLACEMENT OF THE BRIDGE OVER THE RIVER CARDENER IN CALLÚS
DESCRIPTION: Replacement of the existing 92 metre long concrete deck of the bridge over the River Cardener in Callús by a new Corten steel structure.
CLIENT: Barcelona Province Council
DATES: 2011 - 2017
SCOPE: Concept design, construction stage document and site supervision.
COST: 1.177.000 €
PHOTOGRAPHER: Xavier Font, INGLOBA GROUP (aerial)
bottom of page