top of page

CLICK IMAGE TO ENLARGE

​DECK REPLACEMENT OF THE BRIDGE OVER THE RIVER CARDENER IN CALLÚS

​

​

​DESCRIPTION: Replacement of the existing 92 metre long concrete deck of the bridge over the River Cardener by a new Corten steel structure.

​

SITE: Callús (Spain)

​

CLIENT: Barcelona Province Council

​

DATES: 2011 - 2017

 

MISSION: Concept design, construction stage document and site supervision.

​

COST: 1.177.000 €

​

PHOTOGRAPHER: Xavier Font, INGLOBA GROUP (aerial)

 

bottom of page